Gelephu’s rivers offer both opportunities and challenges. Flooding, erosion, and shifting river channels threaten homes, farmland, and essential services. The Gelephu Flood Protection project delivered four interventions to protect vulnerable areas, including a school platform, agricultural land, and the site of a wastewater treatment plant. Local teams also received practical training in construction supervision, environmental management, and river monitoring. Together, these efforts provide a stronger foundation for long-term flood protection and adaptive river management. Invest International proudly celebrates this project as among the earlier DRIVE projects to reach successful completion.
Through the DRIVE programme, Invest International supported the Gelephu Flood Protection project from design and construction supervision through to completion, combining Dutch expertise with strong partnerships between Bhutanese and international stakeholders.
The project strengthens flood and erosion protection along the Mow River and its tributaries, where shifting river channels, sediment deposition and monsoon flows threaten essential infrastructure.
As part of the project, four interventions were implemented:
Together, they provide a coordinated system of riverbank stabilisation and flood protection. Â
The works combine gabion retaining structures, graded rock armour, scour aprons, geotextile filter layers, bank protection and channel management measures. These elements were designed for a highly dynamic, sediment-rich braided river system, with particular attention to toe protection, material quality, drainage, surveys, and post-flood inspection.
A Sediment Management and Operations and Maintenance framework now guides monitoring through repeat surveys, inspections, aerial imagery and adaptive maintenance after monsoon and flood events. Â

The project builds on a long-standing collaboration between the governments of Bhutan and the Netherlands. Initial studies and project preparation began following flood concerns identified in 2015, supported through Dutch Risk Reduction (via RVO) and engineering consultants of CDR International. Construction under the DRIVE-funded project started in August 2024 and was completed in August 2026, with the works formally handed over to Gelephu Mindfulness City in October 2026.Â

As Gelephu develops into a new economic gateway for Bhutan, the project provides an essential foundation for future investments, urban development and community resilience.Â
The project reduces the risks of flooding, riverbank erosion and scour, helping protect lives, homes, public infrastructure and economic assets in and around Gelephu.
By improving flood management and riverbank stability, the project helps communities adapt to increasingly extreme weather events while creating a safer environment for future growth.
The project demonstrates how Dutch knowledge in flood risk management through CDR International and partners, combined with DRIVE financing and local partnerships, can help countries address complex climate and infrastructure challenges.
As Gelephu Mindfulness City takes shape, resilient water infrastructure provides confidence for residents, businesses and investors, supporting Bhutan's long-term economic ambitions.